[2023/08/18 9:27 Rick]
eSolia Yori arrived site at 10:00 JST.
Met with Colt vendor, Miraite-One engineers.
Confirmed Colt ONU is no LAN connection already.
Powered down Colt ONU router. Removed power cable from PDU 6-18.
Fiber is removed from Colt ONU.
Another fiber channel is connected to another active network, so Fiber cable is not removed.
Colt ONU is removed from Rack 3, Backside, 35 Right side (another active ONU still mounted on No.35 left.)
Colt vendor finished removal work and left site at 11:00
Informed Andrew removal work has been completed.
Yori finished collecting information for work report and left site at 11:30