eSolia PROdb

Web Project: 2026-Apr-15 - Execute the IT scope of an office relocation to a new-build site, covering LAN, racks, circuits, equipment move, and workstation setup, coordinated over 8 months across three carriers to a fixed go-live date. - Weekly IT meetings, construction-meeting participation, and bilingual coordination with carriers, cabling, AV, and design vendors - Site surveys and circuit installation with three carriers, including telephony and FAX migration - Structured cabling, rack mounting, and AP installation across desks, meeting rooms, town hall, phone booths, and signage - Pre-cabling to navigate physical constraints (AV control panels routed through ceiling and partitions) - Network equipment relocation (switches, routers, UPS, APs) with serial-number tracking, plus existing-equipment move - Workstation peripheral setup and final pre-go-live readiness checks - 新築拠点へのオフィス移転に伴うITスコープ(LAN、ラック、回線、機器移設、ワークステーション設置)を、3キャリアとの連携のもと、稼働開始日に合わせて8ヶ月間を渡って実施。 - IT部門との週次会議、施工定例への参加、キャリア・配線・AV・デザインベンダーとのバイリンガル調整 - 3キャリアとの現地調査・回線敷設、電話・FAXの移行 - デスク、会議室、タウンホール、電話ブース、サイネージまで含めた構造化配線・ラック設置・AP設置 - 物理的制約に対応した先行配線(AV制御パネルの天井・間仕切り経由) - ネットワーク機器(スイッチ、ルーター、UPS、AP)の移設とシリアル番号管理、既存機器の移動も対応 - ワークステーション周辺機器の設置と稼働開始前の最終確認

Basic Project List Record

Success Story

System Columns