eSolia PROdb

List All on Website

PrintSend
Completion DateDescriptionClient TypeDetails URL
2020/03/08

Steward annual fire-code power outage IT shutdown, restart and re-validation, as well as Canon multi-function printer/copier move.

Medical Device Maker
2020/02/26

Derack backup server and prepare for HDD sendback and main unit disposal, troubleshoot UPS PDU, followup HVAC problem.

Law Firm
2020/02/19

Structured LAN cabling related to warehouse expansion, move multi-function copier from floor to floor, and troubleshoot 3 wireless AP certificate issues.

Medical Device Maker
2020/02/15

Perform regular Windows patch updates on servers, signature updates for anti-virus, and firmware update on Firewall. Install, test, validate the everyday functionality after the updates as a QC step.

Analytical Instruments Maker
2020/02/06

Videoconferencing system unneeded parts and cable removal, replacement work.

Asset Management Firm
2020/02/02

Cisco Unified Call Manager HQ Update, local branch IP Phone operation validation (inbound call, outbound call, voicemail save and retrieve, call hold and transfer, desktop phone screen and LED indicators).

Electron Microscope Maker
2020/01/18

Steward annual fire-code power outage IT shutdown, restart and re-validation, as well as wall mount display construction.

Asset Management Firm
2019/12/19

Coordinate new Giga-class Internet line installation at sister sites, switchover office connection

Real Estate Finance Management
2019/12/18

Coordinate new WAN line installation (NTT fiber and Colt ONU), switch from old fiber to new

Law Firm
2019/12/15

Replace videoconferencing equipment with new Cisco VC devices in two large meeting rooms, perform construction to mount two large-screen monitors on walls

Asset Management Firm
2019/11/18

Deploy new backup server (rackmount, connect), photograph and report

Law Firm
2019/11/07

Switched office WAN user traffic from Orange to AT&T Circuit, then re-validated all aspects of IT

Electron Microscope Maker
2019/10/16

Deploy replacement Fortinet 100E Firewall, troubleshooting with remote engineer to ensure office Internet speed same or better, validating as needed

Steel Wire Technology Maker
2019/10/12

Perform regular Windows update on servers, signature update for anti-virus, and firmware update on Firewall. Install, test, validate daily functionality.

Analytical Instruments Maker
2019/10/11

Steward IT shutdown and restart during planned annual building power cycle and testing, working around system migration to Amazon AWS cloud

Securities Firm
2019/10/02

Coordinate backup tape drive unit replacement for continually failing device, gracefully shutting down and restarting virtual servers, testing and validating

Steel Wire Technology Maker
2019/10/02

Deploy Riverbed SteelConnect in datacenter to enhance SD-WAN performance and redundancy, including rack mounting and cabling changes

Medical Device Maker
2019/10/01

Manage project for Japan VAT change from 8% to 10% in Navision ERP system, perform validation tests required by compliance related to calculations and client-facing output

Medical Device Maker
2019/09/23

Multi-day office layout change equipment move, pull new and remove old cable, re-connect and system validation

Healthcare Firm
2019/08/02

Steward system shutdown and restart for annual power maintenance and tests in Yokohama building, IT systems test and daily-use validation

Analytical Instruments Maker
2019/07/25

ATT WAN circuit activation and Cisco router and switch re-routing after office hours

Electron Microscope Maker
2019/07/06

High-end Projector Installation and Room-to-Room Display Relocation Construction

Medical Device Maker
2019/06/18

Datacenter Device Removal Work from 5 racks, in preparation for move

IT Services Firm
2019/05/31

Replace old VC system with Polycom Real Presence 310 and validation of connection to several sites

Medical Device Maker
2019/05/25

Steward annual power outage of office, including startup, test and daily use validation and Hyper-V and VPN failure troubleshooting

Medical Device Maker
2019/05/25

Steward annual power outage system shutdown and restart, test and daily use validation and old firewall failure troubleshooting and break-fix

Electron Microscope Maker
2019/05/09

New Router Install x2 and ATT Fiber Line Implementation

Electron Microscope Maker
2019/04/25

Remove Decommissioned Citrix NetScaler Appliance, and re-rack surrounding equipment to make earthquake proof.

Law Firm
2019/04/24

Site Survey and planning for 18-year-old out-of-warranty structured cabling replacement project.

Law Firm
2019/04/13

Structured cabling tidy-up work during planned power cycle event.

Asset Management Firm
2019/03/13

Breakfix for failed Yamaha RTX 1210 router/firewall, rewrite of configuration to use latest OS commands.

IT Services Firm
2019/03/10

Steward annual power maintenance of IT for distribution center / warehouse, including startup, test and daily use validation after power up.

Medical Device Maker
2019/03/05

Perform rack-mount and connection of Dell SecureWorks iSensor appliance, working with HQ IT team to test and validate.

Law Firm
2019/03/02

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation refresh and tidy-up, during Building's Annual Planned Power Outage

Asset Management Firm
2019/02/24

Perform office layout change including display mount construction, LAN cabling and move of IT-related devices. Install, test, validate.

Medical Device Maker
2019/02/22

Perform IT coordination for internal office layout change, working with furniture and moving vendors, as well as staff (Phase 1)

Asset Management Firm
2019/02/16

Work with WAN network provider to plan and install router iOS Adaptive QoS Vulnerability security patch.

Electron Microscope Maker
2019/02/16

Perform regular Windows update on servers and firmware update on Firewall. Install, test, validate daily functionality

Analytical Instruments Maker
2019/02/15

Work with Serviced Office to Steward Client IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades, during Building's Annual Planned Power Outage

Intellectual Property Support Firm
2019/02/13

System test for new medical product launch.

Medical Device Maker
2019/02/10

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades and decommissioned system planning, during Building's Annual Planned Power Outage

Law Firm
2019/01/26

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades and old VC system planning, during Building's Annual Planned Power Outage

Medical Device Maker
2019/01/23

RightFAX fax server & gateway device weekend replacement, cut-over and validation at KDDI data center

Medical Device Maker
2019/01/22

Raritan KVM device cable tidy-up, organization and labeling, reconnection

Asset Management Firm
2019/01/20

Steward IT Equipment Shutdown, Restart & Validation, along with documentation upgrades, switch cable cleanup, and troubleshooting for VC system voice or speaker and phone system Hold problem

Asset Management Firm
2019/01/19

Wall-Mounted Presentation Display Relocation, Reconnection, Validation

Medical Device Maker
2018/12/27

New Telecommunication-related Product Market Entry Discussion and Research

Medical Device Maker
2018/12/14

UPS Power Distribution Unit Password Reset and Reconfiguration

Law Firm
2018/11/22

User Access Violation Security Audit

Public Works Firm
2018/11/21

New EDI Server Upgrade, Re-Validation

Medical Device Maker
2018/11/16

Research and Confirm Viability of Firm's Global Standard UPS Usage in Japan

Asset Management Firm
2018/11/15

New AT&T Carrier VPN Line and Device Install, Service Turn-up

Electron Microscope Maker
2018/11/12

Steward IT Equipment Shutdown, Restart & Validation, along with some upgrades, during Building's Annual Planned Power Outage

Analytical Instruments Maker
2018/11/11

Steward IT Equipment Upgrade, Shutdown, Restart & Validation, Troubleshooting, during Building's Annual Planned Power Outage

Medical Device Maker
2018/11/08

New Office Pre-Construction Site Survey for Structured Cabling and Security System

Asset Management Firm
2018/11/04

Steward IT Equipment Shutdown, Restart & Validation during Building's Annual Planned Power Outage

Medical Device Maker
2018/11/04

Relocation work for Marunouchi retail shop and related IT equipment

Fashion Retailer
2018/10/29

Cloud database refactoring and enhancement, adding categories to managed documents for better filtering and reporting

IT Services Firm
2018/10/22

Tokyo WAN failover test and validation with Proximus Co., reporting.

Steel Wire Technology Maker
2018/10/19

Migrate from old Active Directory and File/Print server, validate and document security compliance

Medical Device Maker
2018/10/14

Steward IT Equipment Shutdown and Restart during Building's Annual Planned Power Outage ('tis the season)

Real Estate Finance Management
2018/10/06

Steward IT Equipment Shutdown and Restart during Building's Annual Planned Power Outage

Financial Advisory Firm
2018/09/30

Internal office desk move for about 20 users

Medical Device Maker
2018/09/15

Apply Updates and Patches to Windows Servers, and Firmware Update to Firewall, and re-validate all functions

Analytical Instruments Maker
2018/09/12

Cloud database enhancement, scripting extraction of future-proof markdown text files from Documents data via API, and committing these to source code control for version comparison.

IT Services FirmDetails
2018/09/08

Replace old multifunction devices (printer, copier, scanner) with new models, setup, and test copying, printing and scanning to email and file server folder

Financial Advisory Firm
2018/09/07

Urgent Upgrade of Orange IPANEMA network device

Electron Microscope Maker
2018/09/05

Retail Shop device and circuit relocation work in Okayama, number 2

Fashion Retailer
2018/09/04

Troubleshoot IP Cameras (Traffic Counters) at Retail Shop in Yokohama

Fashion Retailer
2018/08/22

Connect Sales Office WAN via Sophos Firewall Appliance

Analytical Instruments Maker
2018/08/06

ISR Router Replacement triggered by Cisco Field Notice

Electron Microscope Maker
2018/07/21

Cisco Core switch replacement

Asset Management Firm
2018/07/06

Fortinet Firewall appliance implementation and rack cable cleanup

Steel Wire Technology Maker
2018/07/03

Retail shop IT device and Internet circuit relocation in Okayama

Fashion Retailer
2018/06/22

Distribution center recovery construction after mezzanine removal.

Medical Device Maker
2018/06/16

Preparation and Execution of Network Addressing Change and Upgrade 2, Security Audit and Rectification, New FortiNet Firewall Installation

Asset Management Firm
2018/06/15

Security Design, then Sophos Firewall Appliances Configuration, Install and Integration, at Japan HQ and Satellite Sites

Analytical Instruments Maker
2018/06/11

PM for Navision ERP and Infrastructure upgrade

Medical Device Maker
2018/06/03

Preparation and Execution of Network Addressing Change and Upgrade, Security Audit and Rectification, New FortiNet Firewall Install

Financial Advisory Firm
2018/05/22

Windows Domain and Email 'PC Migration' Project driven by Company Acquisition

Electron Microscope Maker
2018/05/19

Apply Microsoft update patches on server in Yokohama office

Analytical Instruments Maker
2018/05/16

WAN redundancy failover test with Proximus

Steel Wire Technology Maker
2018/05/12

Reception TV Mount Construction and Rear Entrance Phone Cabling and Install

Medical Device Maker
2018/05/01

Citrix NetScalar Appliance Install

Law Firm
2018/04/21

VC Wall-mount TV and Core Switch Replacement Construction

Asset Management Firm
2018/04/20

Hiroshima Retail Outlet Store Opening

Fashion Retailer
2018/04/13

Distribution Center Internal Moves, Wifi and Network Construction Activities, due to Japan Fire Code changes

Medical Device Maker
2018/03/21

Lab Showroom Lighting Construction and Flooring Fix

Electron Microscope Maker
2018/03/18

Annual Power Cycle and Maintenance

Medical Device Maker
2018/03/03

Schneider APC Symmetra UPS Replacement

Law Firm
2018/03/03

Offsite WebEx Meeting Setup Support for Conference

Medical Device Maker
2018/03/01

Impella Committee English Language Website Launch

Medical Device MakerDetails
2018/02/11

Annual Power Outage System Shutdown and Restart, Equipment Decommissioning

Law Firm
2018/02/01

Impella Committee Mobile-friendly Website Re-Launch

Medical Device Maker
2018/01/27

Internal office desk move for about 70 users

Medical Device Maker
2018/01/26

Install a new wireless access point to replace their current consumer class one

Asset Management Firm
2018/01/23

International IP Phone Service cutover to local IP Phone Service from Denphone.

Medical Device Maker
2018/01/20

Additional LAN Cable Installation Project

Analytical Instruments Maker
2018/01/13

Internal Office Layout Change and Cabling

Medical Device Maker
2018/01/11

Secure Windows server "inherited" from other vendor, by applying years worth of patches

Analytical Instruments Maker
2017/12/26

Research Toll Free 0120 "FreeDial" Number Options

Medical Device Maker
2017/12/08

Cutover Tokyo Firewall from Virtual to Physical

Medical Device Maker
2017/12/05

Remove Previous PBX Equipment from Rack and Prep for Send-back

Law Firm
2017/12/03

Security Appliance Installation / HDD Onsite Destruction

Law Firm
2017/11/26

Remove LAN Cable post-move

Intellectual Property Support Firm
2017/11/17

Office Move Project

Intellectual Property Support Firm
2017/11/13

Planned Power Maintenance and Windows Update on Servers

Analytical Instruments Maker
2017/11/10

Cisco SX10 Videoconference System Installation

Analytical Instruments Maker
2017/11/10

Replace Switches and Upgrade SonicWall Firewall Firmware

Securities Firm
2017/11/01

EMC AX4-5i Storage Array Removal

Law Firm
2017/10/20

Internet Connection Construction and Media Converter Installation

Intellectual Property Support Firm
2017/10/19

Cisco Video-conference System (MX300) Installation

Law Firm
2017/10/10

Japan VAD Council Japanese-language Website Launched

Academic Society
2017/10/04

Install "Pure Storage" Array HBA Cards to Prep for EMC Replacement

Law Firm
2017/09/29

Border Router Replacement

Steel Wire Technology Maker
2017/09/11

Deploy 2nd Palo Alto Firewall

Medical Device Maker
2017/08/27

Additional LAN Cabling

Asset Management Firm
2017/08/11

Windows update and patch for server

Analytical Instruments Maker
2017/07/25

Disaster Recovery Site Raritan Device Replacement

Asset Management Firm
2017/07/22

New Server Installation

Analytical Instruments Maker
2017/07/18

Initial Quick Launch of "Council for Clinical Use of Ventricular Assist Device Related Academic Societies, IMPELLA committee" Japanese-language Website

Medical Device Maker
2017/07/01

Patch Cabling Replacement in Server Room

IT Services Firm
2017/06/13

New cabling for Wireless AP & Conference room

Law Firm
2017/05/25

Security device replacement, de-rack re-rack

Asset Management Firm
2017/04/11

WAN equipment replacement, backup circuit upgrade, network firmware upgrades

Steel Wire Technology Maker
2017/01/05

Major office and lab construction, office move and consolidation

Electron Microscope MakerDetails
2016/12/01

Japanese Language Website Launch

Medical Device Maker
2016/10/17

Partially-Furnished Office Move Project

Medical Device MakerDetails
2015/03/31

New Konica MFP Installation

Medical Device Maker
2013/07/26

Japan Website Launch

Medical Device Maker
2012/04/28

Tokyo DC Refresh and Earthquake Proofing, and APC Symmetra UPS Replacement

Law FirmDetails
2012/04/14

New AV Video Conference Equipment Construction

Electron Microscope Maker
2012/04/05

New AV Video Conference Equipment Construction Prep

Electron Microscope Maker
2012/03/13

Perform Site Survey for New AV Video Conference Equipment Construction

Electron Microscope Maker
2012/03/08

Create an Independent Direct Number and Voicemail Box for HR

Medical Device Maker
2012/03/04

New Wireless Access Points and Controllers

Electron Microscope Maker
2012/03/01

Pre-cabling Site Survey

Steel Wire Technology Maker
2012/02/28

Logistics Center LAN Cabling Relocation, Re-pull Work

Medical Device Maker
2006/08/01

Japan PM for Rollout of BaaN ERP and ARGO21 EDI to replace Legacy AS/400 System

Medical Device MakerDetails
Displaying 139 records.