表示 | | 2017/05/28 | Regular Power Outage System Shutdown and Restart on 2017/5/27 - 2017/5/28
| | | |
表示 | はい | 2018/05/01 | Citrix NetScalar Appliance Install
| Citrix NetScalarアプライアンス機器インストール
| | |
表示 | | 2018/04/22 | Scheduled blackout for Kubodera twin tower bldg 2018
| | | |
表示 | はい | 2018/04/21 | VC Wall-mount TV and Core Switch Replacement Construction
| ビデオシステム壁掛けディスプレイとネットワークスイッチ取り替え工事
| | |
表示 | はい | 2018/04/20 | Hiroshima Retail Outlet Store Opening
| | | |
表示 | はい | 2018/04/13 | Distribution Center Internal Moves, Wifi and Network Construction Activities, due to Japan Fire Code changes
| 日本の消防法の変更による物流センター内部の配置転換、Wifiとネットワーク工事
| | |
表示 | | 2018/04/12 | move Wireless APs and get it horizontal at JPHQ
| | | |
表示 | | 2018/04/07 | COOK JPDC LAN construction for level 3 on 2018 April 7-8 (Sat-Sun)
| | | |
表示 | はい | 2018/03/21 | Lab Showroom Lighting Construction and Flooring Fix
| | | |
表示 | はい | 2018/03/18 | Annual Power Cycle and Maintenance
| | | |
表示 | | 2018/03/17 | SAC Sullcrom Tokyo - New Symmetra UPS "Intelligence Module Fault"
| | | |
表示 | | 2018/03/13 | ProfEd Site Pre-Launch 20180313
| | | |
表示 | はい | 2018/03/03 | Schneider APC Symmetra UPS Replacement
| | | |
表示 | はい | 2018/03/03 | Offsite WebEx Meeting Setup Support for Conference
| オフサイト会議のWebExビデオ会議組み立て・設定
| | |
表示 | | 2018/02/22 | S&C Tokyo Inventory and Label Equipment Power Plugs
| | | |
表示 | | 2018/02/16 | LIP - Shinjuku Park Tower Planned Power Maintenance 2018 Feb 16-19
| | | |
表示 | はい | 2018/02/11 | Annual Power Outage System Shutdown and Restart, Equipment Decommissioning
| | | |
表示 | はい | 2018/02/01 | Impella Committee Mobile-friendly Website Re-Launch
| IMPELLA部会ウエブサイトの更新、モダン化、モバイルフレンドリー立て直し
| | |
表示 | はい | 2018/01/27 | Internal office desk move for about 70 users
| | | |
表示 | はい | 2018/01/26 | Install a new wireless access point to replace their current consumer class one
| コンシューマ用無線システムを企業用Wifiに取り替え
| | |
表示 | | 2018/01/24 | 0120 Bulletproofing Meeting
| | | |
表示 | はい | 2018/01/23 | International IP Phone Service cutover to local IP Phone Service from Denphone.
| 国際IP電話サービスを、Denphoneより国内IP電話サービスへの切り替えプロジェクト。
| | |
表示 | はい | 2018/01/20 | Additional LAN Cable Installation Project
| | | |
表示 | | 2018/01/20 | [WAMCO] Shinmaru Powerdown on 2018/01/20-2018/01/21
| | | |
表示 | | 2018/01/20 | Carlyle Building Blackout and Equipment Power Cycle 2018 1/20 - 1/21
| | | |
表示 | はい | 2018/01/13 | Internal Office Layout Change and Cabling
| | | |
表示 | はい | 2018/01/11 | Secure Windows server "inherited" from other vendor, by applying years worth of patches
| 以前の業者が構築したWindowsサーバーに、何年かのパッチを当て引き継ぎ
| | |
表示 | はい | 2017/12/26 | Research Toll Free 0120 "FreeDial" Number Options
| | | |
表示 | | 2017/12/20 | Abiomed Tokyo Call Quality Degradation 3
| | | |
表示 | はい | 2017/12/08 | Cutover Tokyo Firewall from Virtual to Physical
| | | |
表示 | はい | 2017/12/05 | Remove Previous PBX Equipment from Rack and Prep for Send-back
| 旧式PBX機器をラックから外し、送り返す準備をする
| | |
表示 | | 2017/12/04 | Abiomed Tokyo Office Internet and Email Outage
| | | |
表示 | はい | 2017/12/03 | Security Appliance Installation / HDD Onsite Destruction
| | | |
表示 | | 2017/11/28 | Abiomed Tokyo Call Quality Degradation 2
| | | |
表示 | はい | 2017/11/26 | Remove LAN Cable post-move
| | | |
表示 | | 2017/11/21 | Abiomed Tokyo Call Quality Degradation
| | | |
表示 | | 2017/11/19 | eSolia Sawa building Power Cycle for Planned Outage 20171119
| | | |
表示 | はい | 2017/11/17 | | | | |
表示 | はい | 2017/11/13 | Planned Power Maintenance and Windows Update on Servers
| 計画的電気メンテナンスをしながらWindowsサーバーのパッチ当て
| | |
表示 | はい | 2017/11/10 | Cisco SX10 Videoconference System Installation
| Cisco SX10ビデオカンファレンスシステムの導入
| | |
表示 | はい | 2017/11/10 | Replace Switches and Upgrade SonicWall Firewall Firmware
| ネットワークスイッチ取り替えとSonicWallファイヤーウォールのOSアップグレード
| | |
表示 | | 2017/11/04 | COOK Nakano office annual power cycle 2017 Nov4-5
| | | |
表示 | はい | 2017/11/01 | EMC AX4-5i Storage Array Removal
| 古くなったEMC AX4-5i ストレージアレーの撤去
| | |
表示 | はい | 2017/10/20 | Internet Connection Construction and Media Converter Installation
| | | |
表示 | はい | 2017/10/19 | Cisco Video-conference System (MX300) Installation
| Cisco ビデオカンファレンスシステム(MX300)の導入
| | |
表示 | | 2017/10/15 | CAC / WBPJ Annual Building Power cycle 2017
| | | |
表示 | | 2017/10/08 | Power-cycle for a Planned Outage - 2017
| | | |
表示 | はい | 2017/10/04 | Install "Pure Storage" Array HBA Cards to Prep for EMC Replacement
| EMC取っ替えの準備に備えて"Pure Storage" アレーのHBAカードの導入
| | |
表示 | はい | 2017/09/29 | Border Router Replacement
| | | |
表示 | はい | 2017/09/11 | Deploy 2nd Palo Alto Firewall
| 2台目のPalo Altoファイヤーウォール機器導入
| | |
表示 | はい | 2017/08/27 | | | | |
表示 | はい | 2017/08/11 | Windows update and patch for server
| | | |
表示 | はい | 2017/07/25 | Disaster Recovery Site Raritan Device Replacement
| | | |
表示 | はい | 2017/07/22 | | | | |
表示 | はい | 2017/07/01 | Patch Cabling Replacement in Server Room
| | | |
表示 | | 2017/06/25 | BTMF Tsuchiura Factory Annual Power Cycle 2017 June 25
| | | |
表示 | はい | 2017/06/13 | New cabling for Wireless AP & Conference room
| | | |
表示 | | 2017/06/11 | Desk move and set up for layout change
| | | |
表示 | | 2017/05/29 | Regular Power Outage System Shutdown and Restart on 2017/5/26 - 2017/5/29
| | | |
表示 | | 2017/05/28 | TFJ FEI Seaside West Building Planned Power Outage
| | | |
表示 | | 2017/05/27 | Regular Power Outage System Shutdown and Restart on 2017/5/27 - 2017/5/28
| | | |
表示 | はい | 2017/05/25 | Security device replacement, de-rack re-rack
| セキュリティ機器取っ替え、ラックから外して付け直す
| | |
表示 | | 2017/05/09 | Monitor Install and Kickoff Meeting
| | | |
表示 | | 2017/04/29 | | | | |
表示 | | 2017/04/23 | | | | |
表示 | | 2017/04/16 | LIP - Canal Building Planned Power Maintenance 2017/04/16
| | | |
表示 | | 2017/04/11 | | | | |
表示 | はい | 2017/04/11 | WAN equipment replacement, backup circuit upgrade, network firmware upgrades
| WAN機器取っ替え、2次サーキットバンド幅アップグレード、ネットワーク機器ファームウェア更新
| | |
表示 | | 2017/04/09 | WPJPESXi2 "B1" Memory Replacement
| | | |
表示 | | 2017/04/05 | AJJ G Suite Suggestions 201704
| | | |
表示 | | 2017/03/22 | CCMT PROdb Enhancements 201703
| | | |
表示 | | 2017/03/13 | Current WIFI research for upgrade
| | | |
表示 | | 2017/03/07 | CCMT PROdb Enhancements 201703
| | | |
表示 | | 2017/03/05 | LJAM scheduled building power outage
| | | |
表示 | | 2017/03/04 | LJAM scheduled building power outage 2018
| | | |
表示 | | 2017/03/03 | COOK Shinsuna DC annual power maintenance 2017 Mar3-5
| | | |
表示 | | 2017/02/11 | Additional Electrical Outlet Installation
| | | |
表示 | | 2017/02/11 | SAC Sullcrom Tokyo - Regular Power Outage System Shutdown and Restart S&C CCR 58831
| | | |
表示 | | 2017/01/14 | [WAMCO] Shinmaru Powerdown on 2017/01/14-2017/01/15
| | | |
表示 | | 2017/01/14 | Carlyle Building Blackout and Equipment Power Cycle 2017 1/14 - 1/15
| | | |
表示 | | 2017/01/09 | NSS II Rack and Equipment Removal, Ship to Seaside
| | | |
表示 | | 2016/12/23 | Seaside Cabling - Security, Sample Prep, Board Room
| | | |
表示 | | 2016/12/20 | Replacement of NIC card in JPTOKBOS01
| | | |
表示 | | 2016/12/17 | Replace switch Module and Fortigate (Firewall)
| | | |
表示 | | 2016/12/09 | | | | |
表示 | | 2016/11/20 | | | | |
表示 | | 2016/11/18 | JPTOKBOS01-Health Service Heartbeat Failure
| | | |
表示 | | 2016/11/07 | | | | |
表示 | | 2016/11/04 | COOK Nakano office annual power cycle 2016 Nov4-6
| | | |
表示 | | 2016/11/02 | Reseat Module in Cisco Core Switch
| | | |
表示 | | 2016/10/30 | 20161030 FEI NSS2 Building Planned Power Outage
| | | |
表示 | | 2016/10/20 | BTMF Visit for WAN Upgrade project
| | | |
表示 | はい | 2016/10/17 | Partially-Furnished Office Move Project
| | Details | 詳細 |
表示 | | 2016/10/16 | CAC / WBPJ Annual Building Power cycle 2016
| | | |
表示 | | 2016/10/08 | LFKK - annual building power maintenance 2016
| | | |
表示 | | 2016/10/04 | Brembo Domain / Navision Migration
| | | |
表示 | | 2016/09/28 | BTMF Visit for WAN Circuit installation
| | | |
表示 | | 2016/09/22 | eSolia Power cycle for building electric maintenance.
| | | |
表示 | | 2016/09/14 | BTMF Visit for WAN Circuit installation site survey.
| | | |
表示 | | 2016/08/08 | Tape backup equipment needs to be replaced 2016Aug8
| | | |
表示 | | 2016/08/06 | Patch Cabling replacement
| | | |
表示 | | 2016/07/30 | eSolia Sawa Bldg Sonet NURO Upgrade Switchover
| | | |
表示 | | 2016/07/29 | ABMD - RF Study for New Office at COREDO Muromachi 1
| | | |
表示 | | 2016/07/28 | FEI - New Office RF Study
| | | |
表示 | | 2016/07/21 | New AT&T circuit Router installation
| | | |
表示 | | 2016/07/20 | Additional UPS installation
| | | |
表示 | | 2016/07/16 | Add new UPS and re-cabling the server Rack
| | | |
表示 | | 2016/07/13 | Survey of Muromachi Higashi Mitsui Bldg 12F for Abiomed
| | | |
表示 | | 2016/07/06 | Cook_file_send_for_solve20160706
| | | |
表示 | | 2016/07/04 | ACN Call Center Workstation setup
| | | |
表示 | | 2016/07/04 | ACN Call Center Workstation setup 7/19
| | | |
表示 | | 2016/07/01 | FEI Seaside Tower Office Seating Analysis Fixed vs Open
| | | |
表示 | | 2016/06/15 | Shin-Yokohama site survey
| | | |
表示 | | 2016/06/07 | PC set up for Mr. Carsten
| | | |
表示 | | 2016/05/25 | WAMCO - WANBISHI Move 5/25-5/26
| | | |
表示 | | 2016/05/24 | Japanese Outline Summary of FEI Spec
| | | |
表示 | | 2016/05/21 | Marunouchi - AP Mounting, CAT-6A Cabling
| | | |
表示 | | 2016/05/18 | AV System Upgrade Meeting
| | | |
表示 | | 2016/05/14 | Migrate Webfaction Web Server to SSD-based CentOS 7
| | | |
表示 | | 2016/05/14 | UPS Replacement and Power Cycle
| | | |
表示 | | 2016/04/30 | COOK KDDI DC problem on Equallogic 20160430
| | | |
表示 | | 2016/04/28 | BTMF building blackout on 2016/04/28 to 2016/5/2
| | | |
表示 | | 2016/04/26 | Wanbishi - New Site LAN cabling.
| | | |
表示 | | 2016/04/21 | openUC upgrade, sipXecs install at Sawa Bldg
| | | |
表示 | | 2016/04/21 | Install new Yamaha RTX1210 router-firewall
| | | |
表示 | | 2016/04/17 | LIP - Canal Building Planned Power Maintenance 2016/04/17
| | | |
表示 | | 2016/04/15 | Regular Power Outage System Shutdown and Restart on 2016/4/15
| | | |
表示 | | 2016/04/15 | WAM Data Center cabling work
| | | |
表示 | | 2016/04/12 | SAC - Desk-port LAN check
| | | |
表示 | | 2016/04/02 | Abiomed Japan Project - additional LAN cabling
| | | |
表示 | | 2016/03/30 | SAC - Core Switch Port Outage
| | | |
表示 | | 2016/03/22 | SAC - PDU Installation for Cisco Core Switch
| | | |
表示 | | 2016/03/13 | COOK Shinsuna annual power maintenance. Power-on task 20160313
| | | |
表示 | | 2016/03/07 | | | | |
表示 | | 2016/03/03 | HP J4813A ProCurve Switch 2524 Prep
| | | |
表示 | | 2016/02/26 | SAC - Server Rack Diagram opdate - 26 Feb 2016
| | | |
表示 | | 2016/02/16 | WAMCO - WANBISHI Relocation project - Site survey 2/17
| | | |
表示 | | 2016/02/16 | SAC - Site survey for PDU installation for Core switch - 16 Mar 2016
| | | |
表示 | | 2016/02/15 | Urgent TOK3750-VC-1 Switch Replacement after Failure (and etc)
| | | |
表示 | | 2016/02/13 | SAC Sullcrom Tokyo - Regular Power Outage System Shutdown and Restart S&C CC 46904
| | | |
表示 | | 2016/02/12 | 2015, Feb 6th - 8th Abiomed Japan Otemachi First Square Bldg. Scheduled Power Outage
| | | |
表示 | | 2016/02/08 | | | | |
表示 | | 2016/01/17 | [WAMCO] Shinmaru Powerdown on 2016/01/16-17
| | | |
表示 | | 2016/01/16 | Carlyle Building Blackout and Equipment Power Cycle 2016 1/16 - 1/17
| | | |
表示 | | 2016/01/09 | Rack and cables relocation
| | | |
表示 | | 2015/12/23 | Cook Japan Systems Lot Traceability
| | | |
表示 | | 2015/12/10 | Glossary of Terms - Japan Product Launch
| | | |
表示 | | 2015/12/07 | Weekly Conference Call Attendees Reference - Japan Product Launch
| | | |
表示 | | 2015/11/20 | WAM-RT Installation in WANBISHI_2015Nov19
| | | |
表示 | | 2015/11/11 | Project Risk Score Assessment Criteria Definitions - Japan Product Launch
| | | |
表示 | | 2015/11/10 | AV System Upgrade Site Survey, initial
| | | |
表示 | | 2015/11/07 | LJAM Office Layout Change 2015 Nov
| | | |
表示 | | 2015/10/30 | COOK Nakano office annual power cycle 2015 Nov 1
| | | |
表示 | | 2015/10/28 | | | | |
表示 | | 2015/10/25 | BTMF building blackout on 2015/10/25
| | | |
表示 | | 2015/10/25 | 20151025 FEI NSS2 Building Planned Power Outage
| | | |
表示 | | 2015/10/25 | Clover building Annual power maitenance
| | | |
表示 | | 2015/10/10 | | | | |
表示 | | 2015/10/10 | LFKK - annual building power maintenance 2015
| | | |
表示 | | 2015/10/02 | Adobe CC Mistaken "License Expiring" Message Troubleshooting
| | | |
表示 | | 2015/10/01 | SAC - Site Survey for ATT Line
| | | |
表示 | | 2015/09/30 | WBPJ - Server Migration Project 20150930
| | | |
表示 | | 2015/09/28 | SAC - Multi function Printer movement 20150928
| | | |
表示 | | 2015/09/25 | SAC - Site Survey for MFP relocation and New PBX circuit installation_20150925
| | | |
表示 | | 2015/09/18 | DNS NS Migration for westbrook.co.jp
| | | |
表示 | | 2015/09/11 | WBPJ - Server Installation project - 20150911
| | | |
表示 | | 2015/09/11 | CAC - Server Installation project - 20160124
| | | |
表示 | | 2015/09/03 | FEI - JPHYDRA01 Alien Vault box installation
| | | |
表示 | | 2015/09/03 | Troubleshooting on the internet connection
| | | |
表示 | | 2015/09/01 | SAC TOKESXI01 and TOKESXI02 removal - 1st Sept, 2015
| | | |
表示 | | 2015/08/04 | まだ間に合う!マイナンバーの情報漏えい対策セミナー
| | | |
表示 | | 2015/08/03 | LPJ - 4th Floor Office Expanding Project - Rack install
| | | |
表示 | | 2015/07/17 | SAC - CTI Scannex box 17 July 2015
| | | |
表示 | | 2015/07/16 | SAMPLE - Brembo - Server Room Survey 20150715
| | | |
表示 | | 2015/07/10 | WAMCO - Cable run work - 10July2015
| | | |
表示 | | 2015/07/04 | Additional LAN cabling and PBX replacement Project
| | | |
表示 | | 2015/06/29 | MWT - In-Design "composite font import problem" troubleshooting.
| | | |
表示 | | 2015/06/27 | PF Pipe Installation Supervision for KDDI Fiber
| | | |
表示 | | 2015/06/02 | MWT - Fabian-san's data transfer to new Macbook and Adobe Creative Clouds installation
| | | |
表示 | | 2015/05/28 | | | | |
表示 | | 2015/05/26 | UPS health check by HCL for JPTOK site on 20150526
| | | |
表示 | | 2015/05/25 | UPS Health Check by HCL on 2015/05/26.
| | | |
表示 | | 2015/05/21 | iMac, Printers and NAS set up
| | | |
表示 | | 2015/05/21 | SAC - New ESXi server port change request
| | | |
表示 | | 2015/05/20 | SAC - New ESXi server installation
| | | |
表示 | | 2015/05/14 | SAC - New ESXi server installation
| | | |
表示 | | 2015/04/29 | User and Computer domain migration : Group B
| | | |
表示 | | 2015/04/25 | Sullcrom Tokyo Cisco 4507E Core Switch Replacement CC #50100
| | | |
表示 | | 2015/04/19 | User and Computer domain migration
| | | |
表示 | | 2015/04/19 | LIP - Canel Building Planed Power Maintenance 2015/04/19
| | | |
表示 | | 2015/04/08 | WAMCO - Shin-Marunouchi Building AV system installation
| | | |
表示 | | 2015/04/01 | Modere Fukuoka Network Relocation Work - 20150401
| | | |
表示 | はい | 2015/03/31 | New Konica MFP Installation
| | | |
表示 | | 2015/03/25 | Sullcrom Switch Power Confirmation
| | | |
表示 | | 2015/03/19 | Sullcrom Cable Inventory Prep for Core Switch Upgrade
| | | |
表示 | | 2015/03/15 | COOK Shinsuna annual power maintenance. Power-on task 20150315
| | | |
表示 | | 2015/03/07 | Landon IP Guest Wi-Fi setup work
| | | |
表示 | | 2015/03/01 | LJAM scheduled building power outage
| | | |
表示 | | 2015/03/01 | LJAM scheduled building power outage
| | | |
表示 | | 2015/02/27 | BEK Guest Wi-Fi setup work
| | | |
... |