Regular Power Outage System Shutdown and Restart on 2017/5/27 - 2017/5/28
Citrix NetScalar Appliance Install
Citrix NetScalarアプライアンス機器インストール
Scheduled blackout for Kubodera twin tower bldg 2018
VC Wall-mount TV and Core Switch Replacement Construction
ビデオシステム壁掛けディスプレイとネットワークスイッチ取り替え工事
Hiroshima Retail Outlet Store Opening
広島市リテールアウトレット開店
Distribution Center Internal Moves, Wifi and Network Construction Activities, due to Japan Fire Code changes
日本の消防法の変更による物流センター内部の配置転換、Wifiとネットワーク工事
move Wireless APs and get it horizontal at JPHQ
COOK JPDC LAN construction for level 3 on 2018 April 7-8 (Sat-Sun)
Lab Showroom Lighting Construction and Flooring Fix
ラボショールーム照明器具と床工事
Annual Power Cycle and Maintenance
年次停電メンテ
SAC Sullcrom Tokyo - New Symmetra UPS "Intelligence Module Fault"
ProfEd Site Pre-Launch 20180313
Schneider APC Symmetra UPS Replacement
シュナイダーAPCシメトラーUPS取り替え・更新
Offsite WebEx Meeting Setup Support for Conference
オフサイト会議のWebExビデオ会議組み立て・設定
S&C Tokyo Inventory and Label Equipment Power Plugs
LIP - Shinjuku Park Tower Planned Power Maintenance 2018 Feb 16-19
Annual Power Outage System Shutdown and Restart, Equipment Decommissioning
年次ビル全館停電及び古いIT機器撤去
Impella Committee Mobile-friendly Website Re-Launch
IMPELLA部会ウエブサイトの更新、モダン化、モバイルフレンドリー立て直し
Internal office desk move for about 70 users
約70人分の社内席移動
Install a new wireless access point to replace their current consumer class one
コンシューマ用無線システムを企業用Wifiに取り替え
0120 Bulletproofing Meeting
International IP Phone Service cutover to local IP Phone Service from Denphone.
国際IP電話サービスを、Denphoneより国内IP電話サービスへの切り替えプロジェクト。
Additional LAN Cable Installation Project
追加LAN配線工事
[WAMCO] Shinmaru Powerdown on 2018/01/20-2018/01/21
Carlyle Building Blackout and Equipment Power Cycle 2018 1/20 - 1/21
Internal Office Layout Change and Cabling
社内席替えとLAN配線
Secure Windows server "inherited" from other vendor, by applying years worth of patches
以前の業者が構築したWindowsサーバーに、何年かのパッチを当て引き継ぎ
Research Toll Free 0120 "FreeDial" Number Options
0120フリーダイヤルのオプションリサーチ
Abiomed Tokyo Call Quality Degradation 3
Cutover Tokyo Firewall from Virtual to Physical
東京ファイヤーウォール導入(仮想から物理機器へ)
Remove Previous PBX Equipment from Rack and Prep for Send-back
旧式PBX機器をラックから外し、送り返す準備をする
Abiomed Tokyo Office Internet and Email Outage
Security Appliance Installation / HDD Onsite Destruction
セキュリティ機器インストールとハードディスク破壊
Abiomed Tokyo Call Quality Degradation 2
Remove LAN Cable post-move
移転後LAN配線撤去
Abiomed Tokyo Call Quality Degradation
eSolia Sawa building Power Cycle for Planned Outage 20171119
Office Move Project
オフィス移転プロジェクト
Planned Power Maintenance and Windows Update on Servers
計画的電気メンテナンスをしながらWindowsサーバーのパッチ当て
Cisco SX10 Videoconference System Installation
Cisco SX10ビデオカンファレンスシステムの導入
Replace Switches and Upgrade SonicWall Firewall Firmware
ネットワークスイッチ取り替えとSonicWallファイヤーウォールのOSアップグレード
COOK Nakano office annual power cycle 2017 Nov4-5
EMC AX4-5i Storage Array Removal
古くなったEMC AX4-5i ストレージアレーの撤去
Internet Connection Construction and Media Converter Installation
メディア変換器とインターネット接続導入
Cisco Video-conference System (MX300) Installation
Cisco ビデオカンファレンスシステム(MX300)の導入
CAC / WBPJ Annual Building Power cycle 2017
Power-cycle for a Planned Outage - 2017
Install "Pure Storage" Array HBA Cards to Prep for EMC Replacement
EMC取っ替えの準備に備えて"Pure Storage" アレーのHBAカードの導入
Border Router Replacement
ボーダールータ機器取っ替え
Deploy 2nd Palo Alto Firewall
2台目のPalo Altoファイヤーウォール機器導入
Additional LAN Cabling
Windows update and patch for server
サーバーの更新とパッチ
Disaster Recovery Site Raritan Device Replacement
災害復旧サイ トにて、Raritan機器取っ替え
New Server Installation
新規サーバー導入インストール
Patch Cabling Replacement in Server Room
サーバールームにて、パッチ配線取り替え
BTMF Tsuchiura Factory Annual Power Cycle 2017 June 25
New cabling for Wireless AP & Conference room
無線アクセスポイントや会議室用新規配線
Desk move and set up for layout change
Regular Power Outage System Shutdown and Restart on 2017/5/26 - 2017/5/29
TFJ FEI Seaside West Building Planned Power Outage
Security device replacement, de-rack re-rack
セキュリティ機器取っ替え、ラックから外して付け直す
Monitor Install and Kickoff Meeting
Scheduled Power Blackout
LJAM UPS Installation
LIP - Canal Building Planned Power Maintenance 2017/04/16
WAN migration at JPIBA
WAN equipment replacement, backup circuit upgrade, network firmware upgrades
WAN機器取っ替え、2次サーキットバンド幅アップグレード、ネットワーク機器ファームウェア更新
WPJPESXi2 "B1" Memory Replacement
AJJ G Suite Suggestions 201704
CCMT PROdb Enhancements 201703
Current WIFI research for upgrade
LJAM scheduled building power outage
LJAM scheduled building power outage 2018
COOK Shinsuna DC annual power maintenance 2017 Mar3-5
Additional Electrical Outlet Installation
SAC Sullcrom Tokyo - Regular Power Outage System Shutdown and Restart S&C CCR 58831
[WAMCO] Shinmaru Powerdown on 2017/01/14-2017/01/15
Carlyle Building Blackout and Equipment Power Cycle 2017 1/14 - 1/15
NSS II Rack and Equipment Removal, Ship to Seaside
Seaside Cabling - Security, Sample Prep, Board Room
Replacement of NIC card in JPTOKBOS01
Replace switch Module and Fortigate (Firewall)
Tokyo Firewall Cutover
JPTOKBOS01-Health Service Heartbeat Failure
Deploy Cisco 2901 K9
COOK Nakano office annual power cycle 2016 Nov4-6
Reseat Module in Cisco Core Switch
20161030 FEI NSS2 Building Planned Power Outage
BTMF Visit for WAN Upgrade project
Partially-Furnished Office Move Project
「居抜き」オフィス移転プロジェクト
CAC / WBPJ Annual Building Power cycle 2016
LFKK - annual building power maintenance 2016
Brembo Domain / Navision Migration
BTMF Visit for WAN Circuit installation
eSolia Power cycle for building electric maintenance.
BTMF Visit for WAN Circuit installation site survey.
Tape backup equipment needs to be replaced 2016Aug8
Patch Cabling replacement
eSolia Sawa Bldg Sonet NURO Upgrade Switchover
ABMD - RF Study for New Office at COREDO Muromachi 1
FEI - New Office RF Study
New AT&T circuit Router installation
Additional UPS installation
Add new UPS and re-cabling the server Rack
Survey of Muromachi Higashi Mitsui Bldg 12F for Abiomed
Cook_file_send_for_solve20160706
ACN Call Center Workstation setup
ACN Call Center Workstation setup 7/19
FEI Seaside Tower Office Seating Analysis Fixed vs Open
Shin-Yokohama site survey
PC set up for Mr. Carsten
WAMCO - WANBISHI Move 5/25-5/26
Japanese Outline Summary of FEI Spec
Marunouchi - AP Mounting, CAT-6A Cabling
AV System Upgrade Meeting
Migrate Webfaction Web Server to SSD-based CentOS 7
UPS Replacement and Power Cycle
COOK KDDI DC problem on Equallogic 20160430
BTMF building blackout on 2016/04/28 to 2016/5/2
Wanbishi - New Site LAN cabling.
openUC upgrade, sipXecs install at Sawa Bldg
Install new Yamaha RTX1210 router-firewall
LIP - Canal Building Planned Power Maintenance 2016/04/17
Regular Power Outage System Shutdown and Restart on 2016/4/15
WAM Data Center cabling work
SAC - Desk-port LAN check
Abiomed Japan Project - additional LAN cabling
SAC - Core Switch Port Outage
SAC - PDU Installation for Cisco Core Switch
COOK Shinsuna annual power maintenance. Power-on task 20160313
Hospital Data Meetings
HP J4813A ProCurve Switch 2524 Prep
SAC - Server Rack Diagram opdate - 26 Feb 2016
WAMCO - WANBISHI Relocation project - Site survey 2/17
SAC - Site survey for PDU installation for Core switch - 16 Mar 2016
Urgent TOK3750-VC-1 Switch Replacement after Failure (and etc)
SAC Sullcrom Tokyo - Regular Power Outage System Shutdown and Restart S&C CC 46904
2015, Feb 6th - 8th Abiomed Japan Otemachi First Square Bldg. Scheduled Power Outage
Data Dictionary Q&A
[WAMCO] Shinmaru Powerdown on 2016/01/16-17
Carlyle Building Blackout and Equipment Power Cycle 2016 1/16 - 1/17
Rack and cables relocation
Cook Japan Systems Lot Traceability
Glossary of Terms - Japan Product Launch
Weekly Conference Call Attendees Reference - Japan Product Launch
WAM-RT Installation in WANBISHI_2015Nov19
Project Risk Score Assessment Criteria Definitions - Japan Product Launch
AV System Upgrade Site Survey, initial
LJAM Office Layout Change 2015 Nov
COOK Nakano office annual power cycle 2015 Nov 1
ATT Line Install
BTMF building blackout on 2015/10/25
20151025 FEI NSS2 Building Planned Power Outage
Clover building Annual power maitenance
PBX-G650 01B FAN Error
LFKK - annual building power maintenance 2015
Adobe CC Mistaken "License Expiring" Message Troubleshooting
SAC - Site Survey for ATT Line
WBPJ - Server Migration Project 20150930
SAC - Multi function Printer movement 20150928
SAC - Site Survey for MFP relocation and New PBX circuit installation_20150925
DNS NS Migration for westbrook.co.jp
WBPJ - Server Installation project - 20150911
CAC - Server Installation project - 20160124
FEI - JPHYDRA01 Alien Vault box installation
Troubleshooting on the internet connection
SAC TOKESXI01 and TOKESXI02 removal - 1st Sept, 2015
まだ間に合う!マイナンバーの情報漏えい対策セミナー
LPJ - 4th Floor Office Expanding Project - Rack install
SAC - CTI Scannex box 17 July 2015
SAMPLE - Brembo - Server Room Survey 20150715
WAMCO - Cable run work - 10July2015
Additional LAN cabling and PBX replacement Project
MWT - In-Design "composite font import problem" troubleshooting.
PF Pipe Installation Supervision for KDDI Fiber
MWT - Fabian-san's data transfer to new Macbook and Adobe Creative Clouds installation
MWT - WIFI Signal Survey
UPS health check by HCL for JPTOK site on 20150526
UPS Health Check by HCL on 2015/05/26.
iMac, Printers and NAS set up
SAC - New ESXi server port change request
SAC - New ESXi server installation
User and Computer domain migration : Group B
Sullcrom Tokyo Cisco 4507E Core Switch Replacement CC #50100
User and Computer domain migration
LIP - Canel Building Planed Power Maintenance 2015/04/19
WAMCO - Shin-Marunouchi Building AV system installation
Modere Fukuoka Network Relocation Work - 20150401
New Konica MFP Installation
新規コニカ複合機のインストール
Sullcrom Switch Power Confirmation
Sullcrom Cable Inventory Prep for Core Switch Upgrade
COOK Shinsuna annual power maintenance. Power-on task 20150315
Landon IP Guest Wi-Fi setup work
BEK Guest Wi-Fi setup work
541 件のうち 200 件の記事を表示しています。 クリックして全て表示