[2023/09/15 9:19 Rick]
Met the eSolia cabling team at 16:45, and confirmed safety first policy.
Confirmed current plan and status.
Confirmed how to enter the ceiling.
Relocated 3 LAN cables from the current location through the ceiling to the factory office area.
Did cable test at both ends of LAN cables in the server room and office area for three cables.
Found out during cable test that LAN cable "factory 3" is not as good as expected and has faulty wiring.
While examining the condition of the cables, we discovered water damage to the cables in the server room.
Wiped all cables soaked in water, removed duct covers, and dried them. We even found a centipede in the cable duct!
Factory3 for AP and Factory2 for printer cables were exchanged. (See decisions below)